Works included: Stabilization of the existing barrel ceiling and recording of the enriched features of the ceiling bed, followed on with the reinforcement of the existing fibrous plaster elements of the ceiling to ensure the stability of the building use.
Type
Fibrous plasterworkCategory
RestorationLocation
LondonYear
2011Value
£35,000.00Programme
4 weeks